After the stakeholder engagement this afternoon at Rizqun Hotel, I managed to go an electrical shop in Gadong and also Cotto in Sengkurong for some fittings hunting. I'll post the findings in the next post. At the site, they had almost completed fixing the steel bar at the kids bedrooms and around the 1st floor perimeter. They also had started preparing the double stair case wooden frame. Lately Brunei had been experiencing a thunder storm in the evening. Just look at the picture below...


Outside the Master suite..look at the black cloud in the sky...

Outside the kids bedrooms


The steel bar at the kids bedrooms is almost ready

Towards the centre of the house

Preparing the wooden frame for the stair case...It is alot difficult than it looks!