7th May 2008
I had been visiting the site almost everyday since I started planting the trees and the plants in order to water them. I was adviced to water them almost everday as the plants were relatively young and needs alot of TLC until they are big enough to look after themselves..
While at the site, I took some time to observe the progress of the construction and this time, I manage to walk around at the Master Suites as the flooring plywood had been laid down ready for cement. Another 40 percent of timber works need be done before steel beams are inserted between the wooden frame for cement. Overall, we are making a good progress...
The Audio Visual room and the Master Suite. Notice the raise and drop floor in the Audio Visual Room.
The view towards the open reception hall and the children bedrooms
Testing the leg space in the Audio Visual room
The children bedrooms from back
The view from the bottom of the Audio Visual room and the Master Suites