I had been visiting the site almost everyday since I started planting the trees and the plants in order to water them. I was adviced to water them almost everday as the plants were relatively young and needs alot of TLC until they are big enough to look after themselves..
While at the site, I took some time to observe the progress of the construction and this time, I manage to walk around at the Master Suites as the flooring plywood had been laid down ready for cement. Another 40 percent of timber works need be done before steel beams are inserted between the wooden frame for cement. Overall, we are making a good progress...

The Master Suite and the Audio Visual room from the walk-in closet
The view at the back of the house. My brother in law, Hazim watering the plants while one of my house maid getting the water from the nearby pond.
The view towards the open reception hall and the children bedrooms
Testing the leg space in the Audio Visual room

Skeletal structure of the study area at the left and AC platform at the right and the children bedroom at the end. Picture taken from the walk-in closet.
The children bedrooms from back

The reception hall and the children bedrooms from the Audio Visual room
The view from the bottom of the Audio Visual room and the Master Suites

The good old ladder which I used to climb up to the first floor.
No comments:
Post a Comment