Tuesday, August 19, 2008

Reflection by the pond

19th August 2008

In the afternoon after work, I stopped by at the Jerudong fish market to get some fish and prawns for the workers. The roof truss has taken its shape and I can see that the workers had been working quite hard in plastering the wall and also installing electrical wiring too. So far so good...

Rare picture of Syafi & Safiya's new house with the mirror image of the house reflected in the pond at the back of the house

The whole overview of the house

From another angle

Yet another angle to the house

Syafi & Safiya's new house at the vicinity of Pasar Borong

The wall outside the Master Walk in Closet and the study area has been fully plastered


Similarly with the wall outside the kid's bedroom

The house viewed from the back


Temporary pond at the formal living room after the heavy downpour in the morning


Another pond in between the double staircases


Progress of the roof truss works (above and below)


From another angle. The roof truss is almost taking its shape.

Wire just underneath the double staircases for the ceiling lighting. That door leads to the dry kitchen.

Hacking the wall below the spiral staircase for additional wire socket

Heaps of electrical wiring at the dining room

Wires at the dry kitchen being installed

Pregnant spotted cat at the site. Not sure who its belongs to.

No comments: