Thursday, August 28, 2008

The 1st floor right side wall has been fully plastered

28th August 2008

Despite feeling a bit dizzy after the blood donation, I forced my self to go to the site to view at the progress. The pictures below says it all...

The whole overview from the side of the house. Notice most of the wall at the 1st floor has now been plastered.

The wall inside the Formal Living

And in the Informal Living

Working outside the Informal Living wall

Outside Safiya's bathroom

Piles of sand in the Master Suites

Some more sand at the corridor outside the Master bathroom

And yet more sand in the Master walk in closet