26th August 2008
It was drizzling when I reached the site this afternoon. Nevertheless, the workers still continue working until 6pm. From the look of it, the plastering work may take up less than a week before they are done and the roof truss works may require a couple of weeks before they start installing the galvanized zinc sheet. At the site too, I managed to discuss with the site supervisor regarding the progress and miscellaneous item for the house such as the ceiling height and the fountains in front of the main entrance.
It was drizzling when I reached the site this afternoon. Nevertheless, the workers still continue working until 6pm. From the look of it, the plastering work may take up less than a week before they are done and the roof truss works may require a couple of weeks before they start installing the galvanized zinc sheet. At the site too, I managed to discuss with the site supervisor regarding the progress and miscellaneous item for the house such as the ceiling height and the fountains in front of the main entrance.
The main entrance. Notice the 2 side panels which will position 2 water fountains at the edge of each panel. I hope they could fabricate this for me and I may also need to look for the water pump by this weekend.
Working in the formal living
The progress of the roof truss. Bear in mind only 2 workers were in charge in fabricating the roof truss. Bravo to the 2 of them.
No comments:
Post a Comment