Tuesday, August 26, 2008

Plastering works continue

26th August 2008

It was drizzling when I reached the site this afternoon. Nevertheless, the workers still continue working until 6pm. From the look of it, the plastering work may take up less than a week before they are done and the roof truss works may require a couple of weeks before they start installing the galvanized zinc sheet. At the site too, I managed to discuss with the site supervisor regarding the progress and miscellaneous item for the house such as the ceiling height and the fountains in front of the main entrance.

The Arch of Syafi and Safiya's house

The space at the reception area

The wall in the Audio Visual room fully plastered

The Master shower and toilet

Outside the Master suite

One of the window in Syafi's bedroom

The 2nd window in Syafi's bedroom

Staring at the aluminium door frame at the veranda

The main entrance. Notice the 2 side panels which will position 2 water fountains at the edge of each panel. I hope they could fabricate this for me and I may also need to look for the water pump by this weekend.

Working in the formal living

Plastering the wall in the kid's playroom

The progress of the roof truss. Bear in mind only 2 workers were in charge in fabricating the roof truss. Bravo to the 2 of them.

The workers trimming the edge of the roof truss with an axe

The edge of the roof truss that has been trimmed