Saturday, August 23, 2008

More Window Frames

22nd August 2008

After work, I stopped by at the site for a quick peek and very please with the progress. The window frame for most of the window had been installed except for the window in the dining hall and the aluminium door frame leading to the balcony. The plastering work and roof truss were also in full swing. Just take a look at the pictures below...

The window frames outside the formal living
From inside and from another angle

The window frames in the prayer room

The window frame in the informal living

The window frame and wiring work in the wet kitchen for the water heater and the insink-erator

The plastering work outside the kid's playroom

The window frame in Syafi's bedroom

The window frame in the Master bedroom

The whole overview of the wall at the left side of the house. All of the window frame had been installed and the only thing left to do is the plastering work.

The wall in the dry kitchen. Notice the wet cement for additional socket.

The wall in the maid's bedroom

The wall outside Syafi's bathroom

Wire for the outdoor uplight

Progress of the roof truss works



Above the car porte

No comments: