15th August 2008

After the Appreciation and Prize giving ceremony of the Brunei SPE National Student Paper Contest 2008 at the Empire Hotel and Country Club, I went to the site to look at the progress of the house construction. I was pleased to see that some of the window frame has arrived and had been installed at some of the area. The roof truss work had also been started as the roof installer (only 2 of them from Thailand) had arrived at the site since yesterday.

Notice the moon during sunset

The window frame for the formal living room

The window frame being applied with cement

The window at one of the kid's bedroom at the back of the house

Measuring the height of the window in the Master bathroom in front of the Jacuzzi bathtub

Measuring the height of the window in the master bath behind the toilet area

Measuring the width of the window in Safiya's bathroom. The window frame in her bedroom has been installed.

Measuring the aluminum swing door in the study area leading to the balcony

Detail work in the informal living

The brick work for the electrical meter from the reception foyer. This space will be covered with cupboard.

The initial roof truss work above Syafi's bedroom