10th November 2008

The pictures below were taken this afternoon when I visited the house. So far, there are still a lot of work to be done for the ceiling but the cement work inside the house is almost complete accept for the major cement work outside the house i.e. the balcony at the back and the side of the house and also the manhole and driveway.

From the right side of the house


The playroom at the 1st floor

The floor at the main reception was smoothen and cemented

From the dry kitchen

The top landing area of the double stair case

From the top view

The ceiling at the playroom's bathroom

Safiya's bathroom

The kid's bathroom at the back of the house

The ceiling in the study area

The Master suite walk in closet

From the Informal Living

Additional gypsum board had been delivered to the site