Friday, November 7, 2008

The 1st Cornices installed

7th November 2008 (Part I)

It has been quite a while since I update the blog. Well, quite a number of progress had been done for the past 6 days and the most obvious progress would definitely be the ceiling installation and also the side walk concrete. Since the tiles for the ground floor was decided to be installed after the ceiling work are done, hence the tile's workers had left the site this morning to another house and will return back to the site once the ceiling had been fully installed and the walls had been painted in 1 month time.

The wall outside

Syafi's bedroom, the 1st room to be installed with cornices


The square drop in Syafi's bedroom

Syafi's walk in closet

The ceiling in the playroom

The side walk and drain at the left side of the house

The back car porch

The right side of the house with the round hole for the uplight

Trying out one of the uplight

The ceiling frame in the informal living with curve design
The dining hall ceiling

The controversial air con position which is too high and need to be adjusted. I'll be meeting with the air con man sometimes tomorrow.

The other 2 air con in the formal living which also need to be adjusted