Friday, November 7, 2008

Ceiling work progress

7th November 2008 (Part II)

These are the random pictures of the progress of the ceiling work taken yesterday.

The informal living

The air curtain will be hidden in the rectangular box above the ceiling

The tiles in the wet kitchen

The entrance to the shower and toilet in the Master bathroom with border to prevent water from flowing to the main floor

The PVC cover of the air con pipes which will be painted with the wall paint

The other side

The ceiling in the Maid's bathroom

The ceiling in the Maid's bedroom

The ceiling in the guest's bedroom

The ceiling in the guest's bathroom which will be open soon as the air duct for the exhaust fan was not yet install

The flexible air duct for the exhaust fan which has to be installed in the powder room, ablution area and guest's bathroom placed temporarily in the ablution area