28th October 2008
Alhamdullillah, the weather today is generally fine accept for some isolated showers near the coastal and inland areas (taken from the local weather forecast). As I arrived at the site, I was astonished to see that the flower design and triangular beam had been fully painted. This afternoon too, I was informed that the workers will start laying floor tiles in the living room. However after further consultation with the construction manager, he suggested that we wait until the ceiling is done in order to avoid scratches on the floor tiles. The ceiling works will also start by tomorrow.
Enjoy the pics below...
Mr. Addin (the painter) told me that he used 3 coats of gold paint for the golden flower design and at noon (when the sun was up), it looks very bright and shiny.