Thursday, September 25, 2008

Swift progress of the house construction

25th September 2009

The work is progressing very fast despite the hot weather in Brunei for the pass couple of days. This afternoon I had a meeting with Mr. Lai and Mr. Thomas (Architect and Construction Manager) for the house paints and other detail items for the house. After visiting the site, I went to several tiles shop in Sengkurong and Jangsak area to finalize tiles selection. I may have to pop in to their shop again by tomorrow.

The whole overview

The right side of the house from Pasar Borong

From another angle

At the back of the house

Close up of the roof tiles work

The opposite side of the car porte

Above the main reception foyer

Above front car porte

From the Master Suite overlooking the open hall and kids bedrooms

At the corner inside the Master Suite

The very skillful Mr. Misbah, the site supervisor plastering the detail design work outside Syafi's bedroom

Other workings working outside the Master walk-in-closet

The view from the Master walk-in-closet towards the Master suite

The electrical work still continue by yesterday

Mr. Lai and Mr. Thomas equipped with the Nippon weatherbond paint catalog and house plans