Presenting the House of Syafi and Safiya's roof tiles

10th September 2008

Yesterday I did not get to go to the site as I was feeling very tired as I was only getting 3 hours sleep the night before. However, this afternoon, I force my self to the site to observe the progress of the house construction. There were a lot of activities going on at the site i.e. Roof workers unpacking the pallets of the roof tiles to check for broken tiles, plastering work at the concrete gutter still continue, the plumber continued hacking the wall in the bathroom for the water pipes and the aircon men trimming the access for the copper piping.

Unveiling the roof tiles. The workers managed to find several dozen of the roof tiles which were broken. The broken tiles will be returned back to the supplier for exchange.

The view from Syafi's bedroom

Hacking the wall in Safiya's bathroom

The finished products

Markings in one of the kid's bathroom at the back of the house

The Master bathroom's wall

Another site of the Master bathroom with separate shower and toilet

From another angle in the Master bathroom

Prepared the marking in the ablution area by one of the plumber Bapak Supianto

The wet kitchen wall has also been plastered

Plastering work outside the Audio Visual room

Working at the left side of the house

The aircon man from Bee Seng Air-conditioning working on the access for the copper piping in the wet kitchen

One of the finished products outside of the wet kitchen