More and more progress

15th September 2008

Its been quite a while since I post the progress of the house. The right side of the roof had been covered by the galvanized zinc and the plastering and electrical works were still going on. At the same time, I had a visitor from Wing Mah Glass for the tempered glass and door in the Master bathroom.

The right side of the house

From the backyard

Misbah (the site supervisor) working diligently alone at the right side of the concrete roof gutter

The garage at the back of the house had been fully plastered

Peter and Ah Chong working on the electrical wiring in Safiya's bedroom


Mr. Andrew from Wing Mah Glass making some measurement in the Master bathroom

Another angle of the shower and the toilet area in the Master bathroom