Installation of Telbru line (Part 2) and the roof tiles have arrived

6th September 2008

This afternoon I went to the site to witness the installation of the telephone krone box outside of the house. To my surprise, the roof tiles had also arrived at the site.

13 pallets of the roof tiles arrived this morning

Close up of roof tile. Specifically selected the sandy brown colour.

Brick layering in the Master Suites

From outside

Close up of the roof truss

The Krone box or DB box of the Telbru line. 4 pairs of the telephone lines had been installed.

The telephone DB box outside the house. I will ask the electrician later to conceal the cable.

The workers taking a time off when the mobile grocery shop arrived at the site

I spotted these kittens at the site after the stray spotted cat had given birth a few days ago

Another sibling of the kittens