Sunday, August 24, 2008

Preliminary Water pipe works

24th August 2008

This morning I had a meeting with the plumber, Mr. Ah Kuang at 9am at the site. Apparently his name is similar with my electrician's name, how coincidence. We were there to discuss about the position of the water pipes and also the water heaters and I also managed to show him some of the taps that we bought from Brisbane. Overall, I am satisfy with the progress of the construction. Thanks to the cloudy weather, which made it colder than usual.

The view from the roof gutter

Hacking the wall in the guest bathroom for the water pipes

The wall in the playroom's bathroom

Presenting Mr. Ah Kuang

Working on the detail

Layering brick on the window frame in the kid's playroom


Outside of Syafi and the kid's playroom


Progress of the roof truss



Making sure the wood is in a straight line
Nailing into position

Saturday, August 23, 2008

Window Glass for Syafi and Safiya's new house

23rd August 2008

Yesterday at the site, I managed to get the latest sample of the window glass from the 'window man' who were there to install the window frame. The glass this time is very beautiful indeed, with reflective cover and golden in colour, truly a winner for Syafi and Safiya's new house. However, this is yet to be confirmed by the queen of the house (Syafi and Safiya's Mummy) and hopefully I may get the answer soon.

The sample of the glass. (From left to right): Tinted bronze or Singapore brown, clear reflective glass (from Wing Mah, Beribi) and the gold reflective glass from my window man.

Featuring Masjid Sultan Omar Ali Saifuddin, BSB

23rd August 2008

This morning after completing some errands at the Land Transport Department at Jangsak and also at the Printing Department in Airport Lama, I dropped by at Yayasan Sultan Haji Hassanal Bolkiah building at BSB to witness a car show. I was particularly interested to see the new H1 van from Hyundai to look at it up close. However, I was a bit disappointed as the leg space at the back of the car is is not as spacious as I expected. This is due to the fact that the car seat at the rear is fixed (cannot be adjusted).

Nevertheless, I managed to take some shot of the cars and Masjid Sultan Omar Ali Saifuddin which is around 80% complete in its refurbishments work that had started early this year.

The Masjid (mosque) looks very beautiful from Yayasan Sultan Haji Hassanal Bolkiah building.

Featuring H1 from Hyundai which cost $45K, equipped with a diesel engine. It's a nine seater. I'm thinking of getting a van for the purpose of sending Syafi and Safiya to school by next year or perhaps the year after. I may still have to look for some other option.

May be the Porsche Cayenne at $168K? ... but I already have a four wheel drive.

Ford S-Max V6 that costs $35K. The sporty look is very impressive but the space is a no go.

The new Honda Stream, a bit smaller than the Odyssey model, and costs around $33-35K.

More Window Frames

22nd August 2008

After work, I stopped by at the site for a quick peek and very please with the progress. The window frame for most of the window had been installed except for the window in the dining hall and the aluminium door frame leading to the balcony. The plastering work and roof truss were also in full swing. Just take a look at the pictures below...

The window frames outside the formal living
From inside and from another angle

The window frames in the prayer room

The window frame in the informal living

The window frame and wiring work in the wet kitchen for the water heater and the insink-erator

The plastering work outside the kid's playroom

The window frame in Syafi's bedroom

The window frame in the Master bedroom

The whole overview of the wall at the left side of the house. All of the window frame had been installed and the only thing left to do is the plastering work.

The wall in the dry kitchen. Notice the wet cement for additional socket.

The wall in the maid's bedroom

The wall outside Syafi's bathroom

Wire for the outdoor uplight

Progress of the roof truss works



Above the car porte

Thursday, August 21, 2008

Progress of the Wall Plastering and Roof Truss works

21st August 2008

The work progress for the pass couple of days was very encouraging. The roof truss has almost taken its shape and the wall plastering work is almost done except for the area that hasn't got the window frame. When I called Mr A-Ting or Mr Teo (the window man) this evening, he informed me that they will put on the rest of the window frame by tomorrow. He also going to show me the sample of the window that I requested, which is the clear reflective glass window rather than the initial glass window quoted in the contract i.e. tinted bronze glass window. I am still waiting for the quotation from him regarding the additional cost that I need to pay.
The whole overview

From a different angle

Plastering the panel at the side of the roof gutter above the car porte

Wall in the study room

Outside the study area and the kid's bedroom

The wall outside Safiya's bedroom

The wall inside the guest's bedroom

Safiya's bedroom above the dining hall

The wall outside the wet kitchen

The wall outside the maid's bedroom

Another angle of the wet kitchen's wall. Notice the detail on the wall.

The whole overview at the back of the house

Tuesday, August 19, 2008

Reflection by the pond

19th August 2008

In the afternoon after work, I stopped by at the Jerudong fish market to get some fish and prawns for the workers. The roof truss has taken its shape and I can see that the workers had been working quite hard in plastering the wall and also installing electrical wiring too. So far so good...

Rare picture of Syafi & Safiya's new house with the mirror image of the house reflected in the pond at the back of the house

The whole overview of the house

From another angle

Yet another angle to the house

Syafi & Safiya's new house at the vicinity of Pasar Borong

The wall outside the Master Walk in Closet and the study area has been fully plastered


Similarly with the wall outside the kid's bedroom

The house viewed from the back


Temporary pond at the formal living room after the heavy downpour in the morning


Another pond in between the double staircases


Progress of the roof truss works (above and below)


From another angle. The roof truss is almost taking its shape.

Wire just underneath the double staircases for the ceiling lighting. That door leads to the dry kitchen.

Hacking the wall below the spiral staircase for additional wire socket

Heaps of electrical wiring at the dining room

Wires at the dry kitchen being installed

Pregnant spotted cat at the site. Not sure who its belongs to.