Monday, June 16, 2008

Installation of door frames

15th June 2008

It was quite a busy day today spending my quality time with my wife and the kids. Nevertheless, I managed to squeeze my time to visit the site twice. In the early morning when the children were still asleep, I went to the site to show the contract workers the wall light that I intend to put near the main entrance door. I requested that the body of the wall light be immersed in the concrete wall, leaving only the curved metal front outside the wall. After taking the necessary measurements, and a quick tour of the house, I went home.

In the afternoon, I went to the site again, together with the whole family for a short visit. I noticed that the brick works are now complete at the ground level, and the workers had started installing the door frames and sealing the gaps with cement. The installation of the roof gutter frame has also continued, but quite a work is yet to be done. It is understood though, since the installation is no easy task.

Entrance to the formal living room. What is left now is to construct an arch on top.


The dining room is now ready. The entrance at the far front leads to a verandah, while the entrance on the right leads to the garage. My wife and I purposely request a huge door so that if needed, we can set up tables in the garage as well, especially during festivities such as Hari Raya. Of course, to resolve the issue of air-conditioning, we will install air-curtains on top of the entrance.


Door frames being installed.



This door frame has been sealed with cement. This leads from the dry kitchen to the informal living room area.


The maid's bedroom. Installation of a door frame towards the in-suite bathroom is also taking place. I also notice that the workers had moved their temporary kitchen here.

Saturday, June 14, 2008

Roof gutter frame 75% complete

14th June 2008

Today, my wife and I together with the kids did some hunting for lighting fixtures for the house. Last Tuesday in Miri, Malaysia, we did find some options for the lightings, but we decide to go with the local suppliers. The quality is more or less the same anyway, so let's support Brunei economy! (hehe.. no offence to anyone yea!)

The hunt proves to be fruitful, we managed to find very appealing fixtures for the main living room, dining room, dry kitchen and prayer room. Now we are left with choosing chandeliers for the informal living room, ceiling fans, down lights and other minor light fittings... and not to mention the huge chandelier in between the double staircases! Except for the price to be paid, that's quite a huge load off our backs.

In the afternoon, we visited the site again. We notice that the wooden frame for the concrete gutter has been finished at the sides and the back part of the house. What is left as at today is the roof gutter frame at the front! With the fast progress achieved so far, I'm expecting that the frame will be ready for cement within a week (I hope so...)

Today, the main entrance is finally taking shape. The workers had started laying bricks at the front, and the main living room and dining room are almost completely covered. Door frames are also being prepared, making us really impressed, in fact we were so happy that we decided to treat the workers with four packets of rice, whole chickens and two large watermelons!

Enjoy the pictures below.

The whole overview.


The main entrance wall now covered with bricks. There won't be much bricks anyway since the front wall will be mostly covered in glass.


Wiring works at the main entrance. Syafi was really interested.


The entrance from the dining room verandah is also ready.


More planks for the roof gutter frame being carefully crafted.


Safiya looking over the spiral staircase area.


Brick works at the other side of the staircases.


Syafi in the wet kitchen.


I guess it was a bit hot.. look at Syafi sweating all over!


Peek-a-boo! Syafi sitting on one of the windows in the guest bedroom.


Door frames being put together.


The door frames ready to be installed.


Compliments for the workers.


The Indonesian and Thailand workers were happy receiving our treat.

Friday, June 13, 2008

Roof gutter under construction

13th June 2008

Today, I went to the site straight from the office to meet up with the security company personnel who canceled the appointment last Wednesday. Shortly after I arrive, my wife came with the kids to visit the site and see the progress of the construction.

We were amazed. Today, almost all the brick works at the ground floor has been completed. What's even more exciting, the workers have started constructing the wooden frame for the concrete roof gutter using beautifully crafted wooden planks. I had the liberty of climbing up and I took pictures of the preliminary preparation of the gutter frame.

The kids had lots of fun today, and they played at the huge vacant land at the back of the house. My wife took lots of their pictures, and you can view it at the kids' BLOG (click). For the house, view and enjoy the pictures below!

The twin towers. The arch has been prepared.


Wooden planks used in constructing the frame for the concrete gutter.


Roof gutter frame under construction. I believe that special craftsmanship is needed to complete such an artwork.


Syafi appreciating one of the four huge windows in the formal living room.


The curved wall of the formal living room adjoining the staircase.


Another view of the staircase being improved. The gap between it and the wall has been covered.


At the vacant area for the spiral staircase.


Syafi and Safiya taking picture in one of the kids' bedrooms. We plan to make this into a playroom for the time being..


Guest bedroom completely bricked. I like the twin windows.

Thursday, June 12, 2008

Roof beams and brick works

11th June 2008

My wife and I visited the site again today to meet with another security company personnel to obtain an alternative quotation price for the house security fixtures. Unfortunately, the appointment was canceled at the last minute.

Anyway, my wife and I noticed that the wooden frame for the roof beam is almost complete. I guess the next job would be putting in the metal bars before pouring cement, and the frame for the concrete roof gutter is also yet to be prepared.

At the ground level, brick works is progressing very fast. My wife and I made a last minute change yesterday by requesting that a small hole be left out on the dry kitchen wall adjoining the wet kitchen. We plan to put a permanent small window but the design is still not settled. Today at the site, we feel that the measurement that I gave to the contractor was under-estimated, the hole was a little bit smaller than expected. I will have to discuss this with Mr Lai probably this weekend. Apart from that, we were delighted with the progress made so far.

View from the back of the house. I have a swimming pool and a play court in my wish list for this large land area still available at the back. We'll see how it goes!


My wife took this picture from the adjoining wholesale wet market (Pasar Borong) earlier on.


Wooden frames for the roof beam on the first floor.


Admiring the high-ceiling area. In front of the double staircases is the main entrance, which will be covered mostly in glass panels. I guess that's why my wife was really appreciating the open area and sat there for quite a while! Hehehe...


The dry kitchen. Notice that small opening?


The wet kitchen (behind my wife) is almost completely bricked. The open area is a small verandah leading the way from the garage (on the right) to the back entrance.


The garage. Workers are still laying bricks at the dining area.


I can't help posting this picture. Some of my plants has bloomed!


Wednesday, June 11, 2008

Syafi and Safiya finally arrives at the site

10 June 2008


After a long anticipation, my wife and kids finally arrive at the site. The project began after they left Brunei for Australia, so definitely they were very excited to see first hand that the house structure has been built. This also explains why I haven't been able to update the blog until now, my time is filled with entertaining Syafi and Safiya after they arrive here last Saturday.

Anyway, back to the project, the workers have now completed laying brick works at the prayer room and most part of the back of the house. They are now moving towards the kitchen and living room areas. At the same time, roof beams are now being prepared as well. From the information that I received from my architect, the roof beams and the concrete gutter might take a while to finish. Nevertheless, my wife and I both hope that lots of progress will be achieved before they return to Brisbane mid-July.

They really looked happy in this picture.. priceless!


My son, Syafi has always been talking about wanting to go up and down the curved staircases. Now his wish has been fulfilled..


At the garage


Syafi playing with a puddle. The top floor is still open at this area for the spiral staircase which leads to the dry kitchen. Good thing my kids were wearing their rain boots.


The prayer room


This is the ablution area, viewed right through to the back of the house.


Thursday, June 5, 2008

Initial Brick's works...

5th June 2008
After work this afternoon, I went to the site as quickly as possible as I observed black clouds all over the Brunei skies. Fortunately, less than 5 minutes after I arrived, it started to rains quite heavily. The workers had started laying down the bricks at the right side of the house i.e. prayer room, ablution area, guest's bedroom and its bathroom. The workers informed me that they will take one day off tomorrow as its their pay day...good for them. I guess I will have to visit the site by Saturday after I pick up my family at the airport as they will spend more than a month in Brunei for the winter holiday in Brisbane. Enjoy the pics below...





Wednesday, June 4, 2008

Bricks, bricks and more bricks

4th June 2008
Yesterday when I went to the site I noticed that the piping conduit for the wall sockets and light switches had been preliminary installed before laying down the bricks. I noticed that the position of the sockets are not to our preference whereby, we preferred to position the sockets a bit lower at 8 inches from the ground than standard position i.e.16 inches or 40 cm from the ground. This morning, I had the privileged to meet up with the electrician, Mr. Peter, and mentioned the preferred socket position. At the same time, I also instructed him to group the air con sockets either at one corner or near the light switches as it was initially position at the centre of the wall underneath the air con. By grouping them together, it will make the interior layout to be smarter and more presentable. The sockets in the dry kithen was also re-position at the height of 1m from the ground as this will place it almost 4 inches away from the counter top of the dry kitchen. This afternoon, when I inspected the house again, I was quite happy with the changes made by the electrician...Thanks a lot mate. By tomorrow, they will start laying down the bricks at the right side of the house first i.e. the prayer room and the informal living. This will be very exciting...

The whole overview as per this afternoon

The front side of the house at the informal living room and the prayer room


At the dining room taken from the back garage

The wet and dry kitchen


Mountain of bricks at the left side of the house. There were about 30 pallets of the bricks and each pallet has 800 bricks. The total of the bricks just for the ground floor?.. I let you do the maths..

Yet more bricks at the front side of the house...