Almost 2 days after the last update, all the cement on the 1st floor has now hardened and dried. The wooden frames had been removed leaving the cement floor exposed. The construction workers had also started working on the 1st floor columns and the front poles columns too.

Unfortunately, after inspecting the progress of the house, I noticed that there were some columns which were misplaced and were not supposed to be where they are. I wish I had spotted them earlier and the only thing left to do is to hack them and reposition it to the right place. I had checked with my wife regarding this issue and I thought we could improvise by designing a marble pole at the top of the stairs. However, she gave the final word of removing it and to follow the original plan in order not to obstruct the view from the top and from below. I entirely agree...


The whole overview of the house

Erecting the columns for the front poles


The stairs from the main entrance. Notice the 2 poles at the top of the stairs. These have to be removed and repositioned next to the kid's bedroom walls and the other one to the home theater's wall. The original idea was to put the hand rail at the top of the stair cases from the middle of the wall up until the centre of the stair cases.

The view of the staircase from the top

From the front. The workers are preparing the steel beams for the giant columns at the front of the house.. One more column to go...

The home theater

The mini swimming pool at one of the kid's bathroom... By the way, all of the bedrooms in the house have on-suite bathrooms, so this 'pool' is one of them.

From the walk-in closet. Noticed the column at the centre of the picture which is directly infront of the Master Suites entrance. This was not supposed to be there and it has to be removed by tomorrow.

The site supervisor, Mr. Asi, checking the house plan. You can also see the column again behind Mr. Asi. It should be repositioned along the wall of the kids' bedroom's entrance which is next to the bathroom. This is where the hand rail starts. Sorry Mr. Thomas (the construction manager) for calling you about the column's issue. Apparently he is in Taiwan now for a business trip...

Thursday, May 22, 2008

Good cement job...

22nd May 2008

As mentioned in my previous posting that today is the day the cement is poured to the 1st floor. The whole operation lasted from morning till afternoon and even by the time I arrived at the site, the cement at the Master Suite and the home theater is still wet. The other part of the area has almost dried. Take a good look at the pictures below...










The pond adjacent to the back of my land

Wednesday, May 21, 2008

Ready to cement...

21st May 2008

At last, all the hard work preparing the wooden frame and steel bar and frame for the 1st floor is complete. The construction manager, Mr. Thomas informed me that they will cement the first floor by tomorrow morning at 8 am. The cement job may last till afternoon due to the large area. A total of 10 cement trucks and a crane has been ordered for the job. I wish I could witness the historic event, however, I had to go to work tomorrow. I'll drop by in the afternoon to see the progress.

The whole overview of the house

The double staircase are now ready to be cemented. Thanks to the expertise of my construction site supervisor and his helpers to construct such an elegant structure..


The view of the staircases from a different angle

Another view of the staircases from the top



The kid's bedrooms ready for cement

The home theater and Master suites


Crossroad of pipes for the wiring

I noticed that the beam at the main entrance (where the worker is sitting on) was not supposed to be there in the 1st place as the main entrance wall will all be covered with glass. It has been overlooked and luckily I was able to spot it before they cement by tomorrow. They will have to dismantle the wooden frame by tomorrow morning.


The construction manager Mr. Thomas and the site supervisor Asi discussing about the final site preparation for tomorrow. Thank you Mr. Thomas for dropping by and checking out the progress of the house. Apparently, my construction manager knows how to speak Thai which is quite impressive.

Sunday, May 18, 2008

Chandiliers versus furnitures...

18th May 2008

There were quite a number of choices that I found very suitable for the house however some comes in a good price and a few others are quite expensives. The pictures below are some fixtures that I am referring to...

This 2.4m diameter grand chandelier which is $6800 after discount. Not bad...

My 2nd choice...very nice...

I like this Master bed. It cost a good $5000 plus after discount which comes with the screen behind the bed, a very comfortable mattress, 2 side tables, a dressing table and a huge cabinet (picture below).


This one may be suitable for the guest bedroom. It cost $860 including mattress

I like the colour. Perhaps this is good for Safiya. This cost $630 only without a mattress.

This one is another good alternative for Safiya perhaps. It cost a good $5999 before discount with cabinet, dressing table and side tables.


A new style purple bed with side table.


The round dining table above with marble top costs $1420 after discount. The length is about 1.38m. The one below with beige chair costs $1240 after discount with length of 1.25m with a white marble base. This may go perfectly with the white cabinet in the dry kitchen.

All in a days work

18th May 2008

This afternoon, I went to several furniture shops in Sengkurong area before heading to the site. The weather today was a bit hotter than the previous day, nevertheless, the electrician had almost completed the piping work and may continue again by tomorrow. I also informed him regarding the wire for the emergency lighting which was not captured in the plan i.e. the Master suite, the reception area, the formal and informal living room and the dry kitchen. I also discussed the space in the Master bath with the construction supervisor (Mr. Asi) which I wanted to increase the length by 0.5m. I may need to inform Mr. Lai (my architect) soon.

The double staircases is 70% done. They may need to continue this by tomorrow.

The view from the top


Towards the centre of the house. The electrical piping is almost done.


The Master suite

The view below the house. All of this wooden poles are needed to withstand the weight of cement for the 1st floor.

Other ideas for the house...

18th May 2008
The day when I had my stakeholder engagement, I managed to snap some pictures at the Hotel and also at some of the fittings that I managed to visit at one of the Gadong electrical shop and Cotto in Sengkurong. This afternoon, I am planning to checkout the progress of the house so for the mean time enjoy the picture below...


The prayer room at Rizqun business centre. I am planning to get this kind of carpet for the prayer room. I need to find where can I get one...

The ablution area. I like the seating arrangement and fittings. Probably I am thinking of maybe fabricating 1 or 2 seats like this if the space permits..

These are the more expensive sockets that I could find at Gadong. You could probably see the price tag. May be we could get several pieces for the Master Suites or Formal living. Subject to change..or else I still prefer the socket that I posted earlier which is a bit cheaper than this one... The single socket for the one above cost $44 and the double one cost $76 while the single light switch cost $36, $38 for double and $42 for triple switches.

The big lamp to the right is the one I am thinking of putting at the big pole infront of our house. It can be fitted with a spot light at the top and bottom and this cost $170 after discount. Need to get 2 of these and not sure if we can get this cheaper in Australia. But for the time being we are still looking for an alternative fashion to this kind of lamp for the pole.

A smaller version of the pole spot light with stainless steel which cost $99 after discount. It will go perfectly for our house's pole if it is alot bigger.


The far end wall lamp is similar to the one we bought in Brisbane except the one we bought is cover with stainless steel. This one cost $60 in Brunei and the one bought in Brisbane cost $20 to $30 which is alot cheaper.


This is a dream Jacuzzi from Cotto, which cost more than $4000. It can also fit 2 people inside.

Preferably the Corner Jacuzzi at the right one is more likely affordable but a lot smaller than the one above. This cost $2300 and only $10 discount is given. The oval Jacuzzi is unprice. By putting the corner Jacuzzi in our Master bathroom, it will make the space alot bigger.

Colourful artificial granite tile which cost $72 each.


This sink cost $180 for white colour, $195 for pastel coulour i.e. sky blue, beige, harvest blue, harvest green, pink and ivory peach and cost $225 for fashion colour i.e. Rasberry, excel wine red, cambridge blue, excel green and black. The good thing about this shop is that you are able to customize your fittings with a cost.

The 1 piece toilet i.e. the one to the right cost $800 for white colour, $850 for pastel colour and $900 for fashion colour.

This is the cheapest 1 piece toilet which cost $630 for white colour, $680 for pastel colour and $750 for fashion colour.