Wednesday, April 16, 2008

Preparation of the house columns

15th April 2008

Today after work I visited the site to see any progress that has been made in the past few days. I observed that the construction workers had started erecting steel bars for the foundation of the house columns. I guess the next step will be putting up the wooden framework for the cement. I also noticed that the perimeter drain has been marked and dug up. I am delighted to see such positive progress. I sent some pictures to my wife in Brisbane and she is also as excited as I am with the development.

As usual, I start with the whole overview of the project.


View from the front. Workers are busy digging up to make way for the perimeter drain.


The steel bars that has been erected.


This is the view from the car port.


I can't wait to see how the staircases will look like!


View from the right side, adjacent to the prayer room. You can also see clearly the future perimeter drain from this picture.


Monday, April 14, 2008

The cement had dried!

13th April 2008

After lunch today, I went to the site just before I drove to Seria for the weekend operation on the land rig (if any of you are not yet aware, I am a Petrophysicist working with Brunei Shell Co.). I am so delighted to see the cement that was poured yesterday had completely dried...Yippee..!

The whole overview, as usual.


The project as viewed from the guest bedroom.


View from the dining room.


The view from the back, showing the car port area.


View from the back entrance. By the way, that white bungalow across the road is also still under construction.


Sunday, April 13, 2008

Cement works

12th April 2008

This morning I decided to go to the site and I was very surprised to see a crane and 2 cement trucks parked in front of the house. Frankly I did not expect them to cement the floor that soon.

The sight of the heavy machineries welcomed me on site.

When I arrived, they had completed cementing the guest's and the maids' bedroom area. I was very impressed with the scale of the operation and I'm feeling very excited at the same time with the progress they had made.

Cement being poured at the dry kitchen area.


Leveling the cement that has been poured.


Main living hall ready for some cement.

Luckily, I was at the site before they cemented the dining area as I spotted a small error whereby the contractors had missed preparing the pipe at the centre of the dining area for a floor-mounted power socket. This was included in the electrical layout of the house plan. The purpose of this socket when I checked with my wife is for any electrical item such as food warmers if we are to put them on the dining table.

The electrician made a last-minute alteration by adding the piping for the floor mounted power socket.


"Octopus wiring"

I also noticed that some contractors were busy expanding the workers' quarters. I was informed that this was to make more room for extra man power, so altogether there are currently about 10 workers on site.


This morning too, I went to Bee Seng company in Kampong Bunut, the sole supplier of Mitsubishi brand air-conditioners for a preliminary discussion on the proposal of the aircon installation. I was very happy with the outcome of the proposal and they promised to come back to me by next week before I fly to Brisbane. The proposal should also include the schedule of the piping installation since we requested it to be readily installed in the walls.

After the appointment with Bee Seng, I went to Batu Bersurat to meet with my second architect, Mr. Lai for the anti-termite services payment. By the way, thanks Mr. Lai for the pictures during the course of the anti-termite treatment.


Friday, April 11, 2008

Anti-termite treatment

10th April 2008

Before the completed soil filling is to be covered with plastic and BRC steel frame for the flooring, I had requested for the whole area i.e. inside and outside the house to be sprayed with anti-termite chemical as the land was once a swampy area. I was also advised to re-apply the chemical outside the compound of my house once in every two years. (Well, we'll see how it goes...)

As I was out at work this morning, I was not able to witness the whole operation. However, my 2nd architect, Mr. Lai made the effort to come and supervised the job. My parents in law were also at the site when they were preparing the chemical mixture, but did not stay long as they couldn't stand the pungent smell of the chemical. It was so strong even all the construction workers had to take a break.

This operation was performed by Tatco Enterprise at the cost of $1800 (Brunei dollars). This was an extra cost since it is not included in the building contract (I should have insisted for that!). From the photo, you can see that for every litre of the chemical, 50 litres of water need to be added before the spraying works is carried out.

The chemical already mixed with water.


Initial preparation: getting the mixing drum and hoses ready.


Connecting the hose with the air compressor.


Spraying works being carried out at various part of the house, inside and out.

Tuesday, April 8, 2008

Soil filling works complete at last

7th April 2008

This afternoon after work, I went to the site for the appointment I made with the land filling contractor. Yesterday, I had requested that he carry out extra works to construct a driveway to the adjacent lands. I also requested a small repair to my part of the land (at the back) that had subsided as a result of the recent land filling works. When doing the works recently, the trucks passed through my land and hence the height has been reduced at some areas. I noticed today that the job had been completed.

For extra information: my part of the land had been land-filled last year while the adjacent lands belonging to my siblings were just completed.

(Above) The driveway to my siblings' land now exists!
(Below) This is the part where my land used to be subsided. Now its back to the way it was before. By the way, these two men are Indonesians fishing at the pond adjacent to our land.




With regard to the house, the contractors had completed soil filling throughout the whole area accept for the dining hall, dry kitchen and the main entrance as they ran out of soil. They may resume with the soil filling by tomorrow I guess.

Whole overview from the front (above) and back (below).



Soil filling works almost complete. What a view!
(Oh, the section where you can see white drainpipes, that will be the laundry room. Further ahead, that will be the ablution area and the powder room).


In this picture, the lowest floor is the car porch. To the right is the dining room and towards the front is the wet and dry kitchen areas.


Main reception foyer. Notice the steel bars? That would be the initial structure for the staircases.



Sunday, April 6, 2008

Soil filling and clearing surrounding grounds

5th April 2008

This afternoon, I brought Ahmad (one of my father in law's gardeners) to the site to assist in clearing up some unwanted shrubs at the back of my land.



With regard to the project, I observed that the workers were busy filling up the spaces between all the beams with soil. When I arrived, they had completed the works on the right part of the house and were still busy finishing up the remaining areas, including the main living hall area. I was informed that once soil-filling works has been carried out completely, they will start leveling the ground with cement. Before that though, on my request, anti-termite substance will be put and due to the large floor area, my contractor told me that it may cost me more than what was expected.



(Above) Whole overview of the project from the front. (Below) Soil-filling works still carried out. In this picture, work is being done on the main living hall area.




(Above) The informal living room, prayer room and guest bedroom area has been completely soil-filled. (Below) The project viewed from the back. You may notice a slight variation in the height of my land compared to the adjoining lands that belong to my siblings (mine is elevated).


At the same time, the land filling works at the lands adjoining mine has also been completed. These land areas are now leveled out but a little lower than my part of the land. In the near future I plan to create a hedge surrounding my land and perhaps some fruit trees as well.



Land filling works completed to the right of my house (above) and behind it as well (below)... job well done! Oh, and for extra information, the white building with green roof that you see in the vicinity is Pasar Tani or better known as Pasar Borong, basically a wholesale market of farm produce. Lucky us, we will never fall short of fresh vegetables and fruits! And to those who has been following this blog, you can see the diverted river from the picture below... made of concrete and surrounded by orange and white coloured fence.




In addition, today I had also carried out some paperworks. I settled the first payment due in the building contract (Well, almost all the amount due, I actually still owe the contractor a little more since my housing loan has not been finalized yet). Thank you Mr. Lai and Mr. Thomas (my 2nd Architect and my construction manager) for your tremendous help, understanding and support.

I had also made arrangements with CH William to request a price evaluation of the land and house construction as is required as part of my housing loan process. I was promised a complete report by Saturday next week (talk about efficient!), so that I could apply the loan by the next Monday. Brilliant!

Thursday, April 3, 2008

The concrete beams are ready!

2nd April 2008

Today, I dragged my brother-in-law, Hazim, and my house-maids to see the progress of the project. I am impressed, the concrete beams has been completely moulded and we can now physically measure and check out exactly the space of all rooms (well, only the ground floor for now).

Even the maids got excited when they learn where their bed and bathroom is located. My wife got a little bit jealous though; the maids getting the first-hand look whilst she can only see these pictures... I guess bringing the maids along was not exactly a good idea...!
(Hehe.. if you must know, the reason why they came along was because I was buying some groceries afterwards at Hua Ho)


To my lovely darling wife, I too wish you and the kids were here! Love you guys very much!

The whole overview of the project.


The informal living room and the prayer room.


The dining room.

This is the back portion of the house.
The picture shows the car port that can fit three cars.



Main living room. The curved window is more clearly visualized now.
Notice that the floor of the main living room is lower than the reception foyer.


Main entrance and reception foyer.